Projects

RF Chambers

Australian Defence
The new tray panel chamber installation performed better than spec. Our design and installation technique reduced onsite time allowing other services to finish.
Location:
John Holland, NSW
Edith Cowan University
Installed a new RF shielded chamber for the computer engineering building at Edith Cowan University WA.
Location:
Doric Construction , WA
New Raytheon
Installed a new RF shielded chamber for Ratheon Australia in South Australia.
Location:
Schiavello Construction, SA
VIEW MORE

MRI Suites

Victorian Comprehensive Cancer Centre
Designed and installed 3 MRI suites for the Victorian Comprehensive Cancer Centre in Melbourne, Victoria.
Location:
Grocon PCL JV, VIC
Alfred Hospital
Provided a dust-proof work area during the upgrade work in Alfred Hospital. Our open and close technique allowed hospital staff to continue working without any interruptions.
Location:
Melbourne, VIC
Launceston General Hospital
This upgrade required door servicing, cleaning waveguide vents, installing new power filters, down-lights and a new skylight as well as relocating fire detection systems.
Location:
Launceston, TAS
VIEW MORE

EMF Shielding

EMF High School Administration Office
The staff working in the administration office experienced recurring adverse health events. An independent study indicated concerns associated with the high EMF levels from the main switch board. Shielding was installed to reduce the EMF to a safe level and then re-tested.
Location:
Pittwater High School, NSW
Stage Managers Seat
During the production of the King Kong stage show, the stage manager had major interferences with the remote communication devices with the stage crew. A brief study identified the source of interference and potential health risk. After installing the shielding we successfully removed the interference, health concerns and we included sound absorption for audible noise.
Location:
Regent Theatre, VIC
Albany Hospital
Installed EMF shielding to switch rooms and switch boards as a retro fit during final construction of Albany Hospital.
Location:
John Holland, WA
VIEW MORE

RF Chamber Relocation

Reconstruct & Modify Using Existing Parts
Designed and built a chamber using existing components from 3 different chambers to include a non-standard double door.
Location:
Austest, NSW
Modify and Extend Roof 4-7m High
Increased the height of an existing chamber from 10.8 x 6.0 x 4.0m to 6.4m and installed ferrite tiles. The chamber was RF tested and checked to meet the EMC test criteria.
Location:
EMC Technologies, NSW
Chamber Relocation
Modified and built an existing RF chamber that had been dismantled and relocated to a new testing facility in South Australia.
Location:
Seeley International, SA
VIEW MORE